A padel club in Riyadh, a coastal hotel court and an indoor squash facility can require very different project briefs. Before selecting a court, connect three decisions: how the venue will operate, what your site team will build, and what will arrive in the shipment.
VELNUZ Courts is a Singapore-based supplier of padel courts, all-glass squash courts and separate glass back wall systems, working with manufacturing partners in China. This guide helps Saudi project owners, contractors and club operators prepare that brief. Local design, approvals and installation responsibilities are agreed separately for each project.

01 / LOCATION BEFORE CONFIGURATION
Saudi Arabia is not one set of site conditions.
The National Center for Meteorology identifies differences between coastal and inland climates, as well as a different rainfall pattern in the southwest. Start with the actual city and site, rather than specifying a generic “Saudi outdoor court”. NCM climate overview ↗
For a court project, our practical recommendation is to use that local context to brief the designer and supplier. The checks below are planning questions, not predetermined engineering specifications.
Riyadh and other inland sites
Describe the intended playing hours, sun exposure and whether the court will be open, shaded or fully enclosed. Ask your design team to assess player comfort, lighting and cleaning access together. Adding a roof alone should not be treated as a guarantee of comfortable daytime play.
Jeddah and coastal locations
State the distance from the coast and whether the structure is exposed or inside a building. Ask for a project-specific review of the steel protection, fixings and maintenance requirements. A court photograph or a standard finish name does not establish suitability for that exposure.
Southwestern and elevated sites
Include the site levels, drainage proposal and local weather design criteria in the brief. Do not carry over a drainage or foundation assumption from an inland project without the local engineer’s review.
For an indoor squash court, provide the building layout, clear height, structural obstructions and the route for bringing glass into the room. Confirm the indoor environmental requirements for the selected floor and court components with the building team.
02 / A CLEAR PRODUCT BOUNDARY
Choose the system. Define what surrounds it.
Start with the facility you need, then agree the package. The court’s playing area is not the full site footprint: circulation, access, equipment and any roof structure need their own space in the layout.
| Project | Start here | Resolve with your site team |
|---|---|---|
| Padel court | Compare classic, panoramic and roof options. View court systems ↗ | Foundation, drainage, access, power and any roof interfaces. |
| All-glass squash court | Plan the complete glass court system. Explore all-glass courts ↗ | Building clearances, floor build-up, glass handling and installation access. |
| Conventional squash court | Review the rear glass wall package. Explore glass back walls ↗ | Existing opening and interfaces. Front and side walls, flooring and lighting are outside this package. |
Keep court equipment and local construction as separate lines in the project scope. Agree the drawings and component information required for the local designer’s review before releasing the order.
03 / THE SAUDI IMPORT CHECK
Bring your importer into the process before shipment.
Saudi import preparation needs to cover the actual shipment. Ask your importer or customs broker to review the component list and product descriptions early, including any separately supplied lighting or other equipment.
Two official starting points
ZATCA: its import instructions identify commercial and transport documents and explain that additional requirements depend on the goods. They direct importers to check the customs tariff or consult a broker for product-specific conditions. Read ZATCA guidance ↗
Saber: Saudi Arabia’s national portal lists a service for issuing shipment certificates for imported commercial products through Saber. Ask the importer to confirm the applicable route and supporting documents for your specific products. View the official service ↗
Agree who will check classification, organise the applicable documentation and complete clearance. Do not treat a generic court description as confirmation that every component meets the same import requirements. Confirm current procedures with your importer before dispatch.
04 / ARRIVAL IS NOT INSTALLATION
Name the delivery point, then plan the route to the court.
“Delivery to Saudi Arabia” is not a complete logistics instruction. Provide the project city and exact handover point. The freight and onward delivery plan for a Riyadh site should be agreed around that destination, rather than copied from a coastal project.
Before dispatch, confirm who will receive and unload the shipment, where components can be stored, and how glass and long structural parts will reach the playing area. For an occupied hotel or residential compound, include access restrictions and permitted working hours.
Have the local contractor coordinate the base, service connections and installation sequence against the agreed court information. Record freight, clearance, inland delivery, unloading and installation responsibilities separately. An equipment supply agreement should not be read as an automatic local installation commitment.
Read our delivery and installation overview ↗05 / START THE CONVERSATION
A useful first message needs six things.
- Location: Saudi city, site address and intended delivery point.
- Court requirement: padel, all-glass squash or a glass back wall; include quantity.
- Venue: indoor, open outdoor or roof-covered; intended operating hours.
- Site information: layout, clear heights, photographs and component access route.
- Local team: who is handling design, import clearance and installation.
- Timing: planned site readiness and opening date, for feasibility review.
Planning a court in Saudi Arabia?
Send your brief and drawings. We will review the proposed court system and supply requirements with you.
Discuss your Saudi projectBEFORE YOU GET IN TOUCH
Common procurement questions.
Can VELNUZ supply a court without taking on local construction?
Yes. Define the court package separately from foundations, building works, electrical connections and installation. Confirm who will carry out each task before production.
Does one specification suit Riyadh, Jeddah and the Eastern Province?
Do not assume so. The court layout may be similar, but the site exposure, building conditions, delivery route and maintenance plan need a separate review for each location.
Can you supply only the rear glass wall of a squash court?
Yes. The glass back wall system is a separate supply option for a conventional squash court. It does not include the front and side walls, flooring or lighting.
Does a court package automatically meet every Saudi import requirement?
No blanket compliance claim is made. Your Saudi importer or customs broker should confirm the classification and applicable requirements for the actual products before shipment.
