A good court starts with a workable site. Resolve the playing area, the space around it and the conditions below it before manufacturing.
DIMENSIONAL STARTING POINT
Room for the game.
A doubles court has a 20 × 10 m internal playing area. Allow additional space for the structure, access and circulation.
FIP rules set a minimum unobstructed height of 6 m; 8 m is recommended for new facilities. The net is 0.88 m at the centre and 0.92 m at the ends.
Schematic only. Not a foundation or construction drawing.
THE SITE CHECKLIST
Six things to resolve early.
01 / Padel court foundation requirements
Commission a local site assessment. Give your engineer the selected court layout, proposed support positions and fixing information, together with the available ground and level survey. Bearing capacity, slab or footing design, anchors and finished levels need a qualified engineer’s approval. There is no universal slab thickness for every site.
02 / Rainwater & drainage
Plan surface drainage and discharge routes before fixing levels. A canopy also needs gutters and downpipes coordinated with site drainage.
03 / Wind, snow & exposure
Provide the location and applicable design loads. Coastal corrosion exposure, extreme weather and canopy loads can change the structural specification.
04 / Access & circulation
Reserve safe entrances, maintenance access, accessible routes, emergency exits and spectator space. Competition out-of-court play requires separate clearance review.
05 / Power & lighting
Confirm supply voltage, cable routes, controls and local electrical rules. Review glare, light spill and lighting levels against the venue’s use.
06 / Planning & permissions
Check land use, building permits, noise, operating hours, fire safety and accessibility with the relevant local professionals and authorities.
TECHNICAL REFERENCE
Rules guide the court. Local requirements guide the site.
Dimensions above reference the FIP Rules of Padel effective January 2026. Final drawings must identify the applicable requirements. This is not a claim of FIP certification or event approval.
Ask the court supplier and local engineer to agree which drawing revision defines the court supports, foundation interfaces and finished levels. Resolve drainage, cable routes and any roof supports on the coordinated site plan before work begins.
The court product drawing describes the selected system; the site-specific foundation design must address local ground conditions and requirements. Confirm each party’s documents and responsibilities in writing.