Skip to content

VELNUZ Courts / CONFIGURATION & SUPPLY

Glass squash court
configuration & supply.

Explore the main components of an all-glass squash court package. Review equipment, project options and site responsibilities as part of your venue planning.

Configuration & Supply material detail
Material detail · actual photograph

REFERENCE MATERIAL SCHEDULE

What makes up
an all-glass court?

The following describes a reference relocatable package. Final factory configuration, quantities and electrical requirements are confirmed in your project specification.

01Installation base

8 mm steel base, supplied in 11 sections.

02Modular wood floor

Reference playing area: 62.4 m². 22 mm maple surface, 40 × 50 mm LVL battens, 12 mm plywood and 18 mm resilient pads.

03Front & side glass

12 mm low-iron tempered glass with ceramic screen printing. Colour selected to the project brief.

04Glass supports

Upper and lower glass support assemblies, coordinated with the wall layout and connection drawings.

05Rear wall & door

12 mm low-iron tempered glass, rear-wall panels, glass door and support fins.

06Hardware

Aluminium mounting components, stainless-steel fixings, sleeves and squash door hardware.

07Court markings

Court boundary tapes, with colour agreed against the glass and floor finishes.

08Adjustable tin

6,400 mm aluminium sound board; reference settings of 480 mm and 430 mm.

09LED lighting

LED lighting and mounting supports are specified for the agreed court layout. Fixture quantity, wattage and electrical supply are confirmed in the project specification and drawings. Final layout and electrical compatibility require project review.

COMPARE LIKE FOR LIKE

Three parts to
a clear supply scope.

01

Court equipment

Glass, base, flooring, hardware, markings, tin and the selected lighting package. Confirm finishes and quantities against the drawings.

02

Transport & delivery

Packing, origin handling, freight, destination charges and delivery to site. The project documents identify the agreed delivery terms and responsibility split.

03

Site & services

Civil works, utilities, local labour, lifting, installation support, taxes and approvals. Included and excluded items should be explicit.

Maple floor surface and layered substructure sample
Floor assembly · actual photograph

OPTIONS, NOT ASSUMPTIONS

Specify what
your project needs.

Finishes & branding

Glass colour, floor finish, line colour and approved branding positions.

Installation & support

Supply-only, guidance or supervision, with local site responsibilities defined.

Spares & care

An agreed spare-parts list, replacement references and maintenance documentation.

A FEW USEFUL ANSWERS

Before you get started.

Is the reference configuration suitable for every project?

No. The final configuration depends on court quantity, finishes, site conditions, destination and the agreed service scope.

Are the lights suitable for my country?

The reference schedule lists 220 V luminaires. The final equipment must be checked against local voltage, frequency, electrical rules and required product documentation.

What technical requirements guide your court package?

Published WSF court dimensions are used as the design reference for the court package. The agreed drawings and material schedule set out the dimensions, components, installation requirements and acceptance checks for your project.

LET’S PLAN YOUR COURT

Your space. Your ambition.
Let’s work out the details.

Send your country, city, court quantity and any available floor plan.
We will help you define the equipment and delivery scope.

Discuss your squash project