VELNUZ COURTS / PROJECT PLANNING
Plan your
padel court project.
Plan your padel project in three parts: the court package, delivery to the agreed destination, and installation on a prepared site. This guide helps you define each part before confirming the supply scope.

Padel court planning
Court package, delivery and installation
01Court kit+
Confirm the selected steel frame, tempered glass, artificial turf and LED lighting in the component schedule. Define packing, transport and site work separately.
02Delivered court+
The kit plus export packing, sea freight, import duty and taxes, and delivery to site.
03Installed court+
The delivered court plus foundations, drainage, electrical work and installation labour on a prepared site.
Padel court planning
What shapes your padel court configuration
01Model+
Classic, panoramic, full panoramic or roof-covered: compare the supporting structure, viewing layout and component drawings for the selected model.
02Specification+
Steel profile and coating, glass thickness, turf type and lighting.
03Quantity+
Several courts share drawings, packing and freight.
04Transport route+
Sea freight, customs and destination charges, delivery to site.
05Site readiness+
Slab or footings, levels and drainage, designed by a local engineer.
06Roof or canopy+
Supports, drainage, wind and snow loads and building approvals.
07Service package+
Supply only, or supply with installation supervision.
Padel court planning
Frequently asked questions
01Is the court package the same as a completed venue?+
The court package and the finished venue have different scopes. Confirm transport, import arrangements, foundations, drainage, installation and lighting connections separately with the teams responsible for each part.
02How do classic and panoramic court configurations differ?+
Classic, panoramic and full panoramic courts differ in their supporting structures and viewing experience. Compare the selected model drawings and component specifications for your project.
03Do I need a roof over an outdoor padel court?+
Not necessarily. A canopy extends playing hours in rain or strong sun but needs its own foundations, drainage and approvals. Confirm the roof structure and its supply responsibilities separately.
04What does the padel supply scope cover?+
Define the court package, transport arrangements and site work separately. Record the components, packing, delivery point, engineering interfaces and installation responsibilities for your project.
Padel court planning
Related pages
Padel court planning
Sources
Last reviewed 2026-10-01.
Padel court planning
Planning a project?
Send your country, city, number of courts and timing. We review the proposed configuration and supply requirements with you.
